references List of major projects of HTMAS Co. and affiliates. For further details please contact our representative.

Delivery terms Work Scope Client
20 2013 Photovoltaic power plant, inst. power 3MWp Financing management, EPC contract for construction of photovoltaic power plant PVP Voivozi 2. Project value is 6 mil. EUR HTM Development S.R.L. (Romania)
19 2012 Photovoltaic power plant, inst. power 3MWp Financing management, EPC contract for construction of photovoltaic power plant PVP Voivozi 1. Project value is 6 mil. EUR SEZ Trade S.R.L. (Romania)
18 2011 Photovoltaic power plant, inst. power 1 MWp Financing management, EPC contract for construction of photovoltaic power plant FVE Vígľaš 2. Project value is 2,85mil. EUR AB Gama s.r.o.
17 2011 Photovoltaic power plant, inst. power 1 MWp Financing management, EPC contract for construction of photovoltaic power plant FVE Vígľaš 1. Project value is 3,02mil. EUR PB Tau s.r.o.
16 2010-2011 Multifunctional retail building in the center of Stara Tura city. EPC contract for reconstruction and rebuilding of formal multifunctional building at the centre of Stara Tura city. Project value is 2,0mil EUR HIGHWAYPOINT ONE, s.r.o.
15 2010 Photovoltaic power plant, inst. power 1 MWp Financing management, EPC contract for construction of photovoltaic power plant FVE Drzenice, Levice location. Project value is 2,7mil. EUR ENERGY HOLD, spol. s r.o.
14 2010 Photovoltaic power plant, inst. power 840kWp Complete EPC contract for development and construction of photovoltaic power plant at our own facility – HT technology park Vlkanová. Value of the project is 2,5mil. EUR HTMAS s.r.o.
13 2009 Wood saw in Krasno nad Kysucou Technology equipment legalization procedure, Permanent operation permit engineering works, CE certification, revision reports, Final Operation permit procedure, Consulting services SWEDWOOD Slovakia, s.r.o.
12 2011 Electric deposition, water born painting line, MOBIS Slovakia Final Operation Permit procedure under IPPC procedure incl. technology installation consulting services (installation engineering and consulting services, fire fighting documentation, technology project, revision reports, CE certification procedure for complete technology lines, Authority Engineering, etc.) YOUNG San Techno, Korea
11 2008-2009 Plastic molding factory Technology equipment legalization procedure .. providing technology project documentation, firefighting documentation, Technology building permit, CE certification, revision reports, Final Operation permit procedure, Consulting services. PROMENS Nitra, s.r.o.
10 2008 VPC line and Water Booth Line in HYUNDAI Motors Manufacturing Czech project Technology installation and CE certification procedure (mechanical modifications of the line, revision reports, technology project documentation, firefighting documentation, Authority Engineering) Baeg San Tech Co. Korea
9 2007 Production Shops KMS factory Complete service of the Final Operation Permit for Press, Body, Assembly, VPC, Engine Shops as well as other Building Objects under responsibility of KMS:
- Technology installation consulting services
- Authority Engineering
- Fire fighting documentation
- Technology project execution
- Environmental and Authority Engineering
KIA Motors Slovakia s.r.o.
8 2007 Production Shops KMS factory CE Certification of complete technology in:
- Press Shop
- Body Shop
- Engine shop
- Education and Training Centre
KIA Motors Slovakia s.r.o.
7 2007 Tire Assembly line – KIA Motors factory Technology installation engineering and consulting, CE certification procedure for Tire Assembly Line (SO 430) (mechanical modifications of the line, revision reports, technology project documentation, firefighting documentation, Authority Engineering) HAMCO Korea
6 2007 VPC line – KIA Motors factory Technology installation and CE certification procedure for VPC line (SO 750) (mechanical modifications of the line, revision reports, technology project documentation, firefighting documentation, Authority Engineering) Baeg San Tech Co. Korea
5 2006-2009 HT technology park Vlkanová Industrial park project development, from EIA, Planning Permit, Building Permit, Operation Permit. All inclusive engineering from land development up to Rent Contract arranging for HTMAS s.r.o. client, total project value 10mil. EUR HTMAS s.r.o.
4 2007-2008 Heat treatment shop Complete technology construction, development and installation services, all stages of the project provided from EIA, Planning permit, Building Permit, Final operation permit, CE certification services .. all inclusive project management services, total project value 5mil. Eur HTS BB s.r.o.
3 2006-2007 Steel cutting and bending plant Final Operation Permit procedure incl. technology installation consulting services (fire fighting documentation, technology project, revision reports, CE certification procedure for complete technology lines, Authority Engineering) HYSCO Slovakia s.r.o. (Hyundai Steel Company, Korea)
2 2005–up to date Local representation - TRACTEBEL Representation office of Cheming, a.s. Czech Republic, member of TRACTEBEL Engineering Group (SUEZ), Belgium TRACTEBEL Engineering (SUEZ Group)
1 2004-2005 Bioethanol plant ADW Bio, a.s. Czech Republic Project Management services for private Investor .. full responsibility for plant preparation phase from EIA, Planning Permit, Building permit, technology selection, know-how implementation, procurement of supplies, etc. up to construction phase .. project value 800mil. CZK ADW Bio, a.s.